亚洲最色-亚洲最色网-亚洲最色网站-亚洲最稳定资源在线观看-亚洲最新地址-亚洲最新视频在线观看

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 久久人人爽人人爽 | 久久最近最新中文字幕大全 | 中文福利视频 | 波多野结衣手机视频一区 | www.日日| 看大片全色黄大色黄 | 亚洲国产精品综合一区在线 | 激情亚洲婷婷 | 国内精品久久久久 | 日本在线亚州精品视频在线 | 四虎永久免费观看 | 尹人香蕉久久99天天拍欧美p7 | 91久久综合九色综合欧美亚洲 | 久久九九有精品国产56 | 国产视频一区在线观看 | 人人爱天天做夜夜爽88 | 特级黄色视频毛片 | 四虎网站在线观看 | 四虎成人免费观看在线网址 | 日韩欧美一区二区三区不卡 | 久久久精品视频免费观看 | 五月天婷婷一区二区三区久久 | 欧美精品v欧洲高清 | 久久99精品久久久66 | 色综综 | 久青草国产在线 | 欧美在线激情 | 999精品视频这里只有精品 | 欧美色穴| 一级毛片在线免费观看 | www.黄色一片 | 色色色在线| 成年女人免费看一级人体片 | 国产精品成人不卡在线观看 | 国产欧美一区视频在线观看 | 婷婷涩涩 | 色综合久久久 | 日本无翼乌全彩无遮挡动漫 | 九九99九九在线精品视频 | 免费视频一区二区三区四区 | 伊在人亚洲香蕉精品播放 |